• +86 536 2326298
  • Email

ABOUT MI DUN

Contact Details

  • PHONE: +86 536 2326298
  • FAX: +86 536 2326298
  • EMAIL:

Executive Standard

Tooling cleaning

1. The detergent uses a washing powder with strong detergency.

2. The washing machine should adopt a washing machine with a drying function.Work shoes

3. Cleaning methods and procedures Each person places the dirty work clothes at the designated place according to the specified time.

The tooling is cleaned in different areas according to the cleanliness level or workshop. The tooling shall be cleaned in batches and in batches, and the amount of laundry shall not exceed 2/3 of the laundry capacity. For individual dirty tooling, the laundry must be cleaned by hand and then washed by a washing machine. Put the dirty work into the washing machine, add the appropriate amount of washing powder, and cover the top of the washing machine. Turn on the power, turn on the faucet switch, turn it on, set the laundry program, and start the laundry. After the first dewatering and refilling, pick up the top cover of the washing machine, add 1 bottle (500ml) of laundry detergent, continue to rinse twice, and finally dehydrate and dry. After use, unplug the power plug, turn off the tap, and hang the drain on the hook on the side of the washing machine. After washing and drying, the clothes must be sent to the clothes room to dry. Folded neatly, if damaged, it should be repaired (the same fabric should be used for repair). The tooling in the district and the 100,000-level area are packed in different clean plastic bags according to the department and number, and are promptly sent back to the corresponding areas of each department for storage. The 10,000-level tooling can be used after sterilization according to regulations. The cleaning and drying of the work shoes is carried out in the downstairs hall. The work shoes are soaked for 30 minutes with washing powder according to the cleanliness level to which they belong, washed by a washing brush with a brush, and rinsed with water.

4. Cleaning cycle and storage location

The uniforms in the district include yellow tooling, white coats and dark workwear. The laundry room and clothes room are located in the downstairs hall. The tooling in this area is usually changed once a week, and each person will put the replaced dirty tooling at the designated place after each Friday shift. If others use less tooling and the tooling is cleaner, the cleaning interval can be extended appropriately. In case of special circumstances, the tooling with serious contamination should be cleaned at any time. The cleaners collected dirty tools and cleaned them on Monday morning. The cleaning cycle of the work shoes is the same as the tooling, and can be used after washing and drying. Clean work clothes are promptly sent back to the locker room in the Pu district on the second floor for storage.

Aviation tooling The overalls in this area are white sterile clothes. The laundry room and the clothes room are located in the corresponding areas of each workshop. The tooling in this area is changed once a shift, and each person will put the replaced dirty tooling at the designated place. After the cleaners go to work, they will collect and clean the dirty clothes that have been replaced by the previous class. After cleaning and drying, the toolings are placed in different clean silk bags according to the number. The foot covers are bundled separately, put into the metal box, and the metal box is sent into the double steam sterilization box at a pressure and temperature of 0.14Mpa. Sterilize at 121 ± 2 ° C for 1 hour. After sterilization, the sterile clothes can be taken out from the 10,000-zone area after being cooled. During this period, the steam sterilization box should not be opened to the door of the Pu district. The double door of the steam sterilization box is strictly prohibited.



TAG:   Work shoes